What Wholesale Payment Terms Should First-Time Bag Buyers Expect?

What Wholesale Payment Terms Should First-Time Bag Buyers Expect?

Payment terms are the part of a bag order that buyers negotiate last and understand least. Most first-time buyers focus on unit price and delivery date, then accept whatever payment structure the supplier proposes. That structure determines how much money is at risk before a single bag is inspected.

The stakes are straightforward. A thirty percent deposit on a large first order can be a significant sum sent to a factory with no track record. A full prepayment removes all leverage. A generous credit term from an unknown supplier may signal desperation rather than confidence.

Why terms matter more than price

Terms change the real cost of an order. A factory quoting a lower unit price but requiring full prepayment is asking the buyer to fund the entire production run and carry all the risk. A slightly higher price with a deposit and balance on inspection can be the better commercial proposition even though it looks worse on a comparison sheet.

What buyers actually want to know

First-time buyers want to know what is normal, what is negotiable and what should be treated as a warning. They want to know whether thirty percent deposit is standard or whether it is excessive, and what protections exist if the goods arrive wrong.

This article explains the payment structures used in PU leather bag manufacturing, what a reasonable first order looks like, how deposits and balances should be split, what trade terms mean for risk, how to protect payment against defects, what to do about currency and fees, and which terms should raise concern.

What Normal Looks Like

Most wholesale bag orders follow a small number of payment patterns, and knowing them makes an unusual proposal visible.

The standard split

The most common structure is a thirty percent deposit with production beginning on receipt, and seventy percent balance due before shipment or on presentation of shipping documents. This is the baseline against which other proposals should be judged.

Variations that are common

Fifty fifty splits appear for smaller orders where the administrative cost of a balance payment is not worth deferring. Twenty thirty fifty structures appear for larger orders with defined production milestones.

What is genuinely unusual

Full prepayment before production, or payment in full before any material is purchased, sit outside normal practice for a new supplier relationship. They are not automatically dishonest, but they place all risk on the buyer.

Structure Deposit Balance Typical use
Standard 30 percent 70 percent before shipment Most first orders
Small order 50 percent 50 percent before shipment Low value, simple goods
Milestone 30 percent Split at defined stages Larger or complex orders
Balance on documents 30 percent 70 percent against bill of lading Established relationship
Credit None Net 30 to 60 after arrival Repeat buyers with history
Full prepayment 100 percent None Uncommon, high risk for buyer

Why the deposit exists

The deposit funds materials. PU leather, lining, hardware and packaging are purchased before production begins, and a supplier who buys them without any commitment from the buyer carries the risk of an order being cancelled.

Why the balance sits before shipment

Suppliers generally will not release goods without payment because once the container leaves, recovery becomes difficult. The buyer’s protection therefore comes from inspection before the balance is paid, not from withholding payment after shipment.

Buyer and factory representative reviewing supply contract payment terms with a PU leather bag sample

Deposit and Balance Structures

The split between deposit and balance determines how much money is exposed at each stage of an order.

Thirty seventy

The default in most wholesale manufacturing. The deposit covers materials, the balance covers labour and margin and is paid when goods are ready. It balances the supplier’s material risk against the buyer’s quality risk.

Fifty fifty

Common on smaller orders. It reduces the supplier’s exposure to cancellation and simplifies administration, but it also increases the amount at risk before inspection.

Milestone payments

Larger orders are sometimes split across production stages: deposit, after materials are cut, after assembly, before shipment. Each milestone should be tied to a verifiable event, not to a calendar date.

The balance timing question

Balance before shipment versus balance on documents is a meaningful difference. Balance on documents gives the buyer slightly more leverage, because payment follows evidence that goods have actually shipped.

Split Buyer exposure before inspection Supplier protection
30 / 70 before shipment 30 percent Materials funded, balance secured
50 / 50 before shipment 50 percent Strong cancellation protection
30 / 70 on documents 30 percent until shipment Payment follows shipment
30 / 40 / 30 milestone Varies by stage Stage funding
20 / 80 on arrival 20 percent Weak, rarely offered
100 percent upfront 100 percent Complete

The mistake of over-negotiating the deposit

Pushing the deposit very low looks like good risk management but often produces a supplier who funds materials reluctantly, buys cheaper material, or deprioritises the order. A workable deposit buys cooperation.

What a deposit should be tied to

Ideally the deposit is released against material purchase evidence: a material order confirmation, a stock reservation or a photo of received material. That converts an abstract payment into a funded step.

Terms for a First Order

A first order with a new supplier deserves different terms from a repeat order with an established one.

Keep the first order small enough to lose

The most effective payment protection is order size. A first order sized so that a total loss would be survivable removes most of the need for complex payment instruments.

Standard terms plus inspection

Thirty seventy with third-party inspection before the balance is a reasonable and commonly accepted position. It is not aggressive, and most legitimate suppliers will accept it.

Sample and production as separate transactions

Pay for samples separately and promptly. Mixing sample costs into production payment creates accounting confusion and removes a clean way to evaluate the supplier cheaply.

What to ask for in writing

Deposit percentage, balance trigger, currencies, bank details on company letterhead, and the remedy if goods fail inspection. A one-page payment schedule avoids most later disagreement.

First order element Reasonable position Reason
Deposit 30 percent Funds materials without over-exposure
Balance trigger After passed inspection Creates leverage before payment
Inspection Third party, buyer’s choice Independent evidence
Order size Survivable if lost Limits downside
Samples Paid separately Clean evaluation
Documentation Written schedule Prevents ambiguity

A first order is a test of the supplier’s process as much as their product. Payment terms should make the test observable.

Avoiding the temptation of a large first order

Suppliers often offer better unit pricing at higher volume. The saving rarely compensates for the risk of sending a large deposit to an unproven factory.

Tying Payment to Inspection

The single most effective payment protection is making the balance conditional on a passed inspection.

How the mechanism works

The supplier notifies the buyer that goods are ready. The buyer arranges inspection against an agreed standard. If goods pass, the balance is released and shipping proceeds. If they fail, the supplier reworks or replaces before payment.

Who pays for inspection

The buyer normally pays. The cost is small relative to the order value and is the cheapest insurance available. On larger orders the fee is negligible.

Defining the standard in advance

Inspection is only meaningful if the standard is agreed before production: AQL levels, critical defects, measurement tolerances, colour reference. An inspection against an undefined standard produces an argument, not a decision.

The rework loop

Decide in advance what happens on failure. Typically the supplier reworks and reinspection is at their cost, or the buyer may reject and recover the deposit. Both outcomes should be written down.

Inspection element Agree before production If omitted
Standard and AQL Written, referenced Dispute over pass or fail
Timing Before balance payment No leverage
Who inspects Buyer’s nominated party Supplier self-certifies
Failure remedy Rework or reject Negotiation under pressure
Reinspection cost Supplier if failed Buyer pays twice
Sample reference Retained approved sample Nothing to compare against

Inspection does not replace a good supplier

Inspection catches defects; it does not create quality. A supplier who fails inspection repeatedly is a supplier problem, not a payment problem.

Partial shipment and pro-rata payment

On large orders, goods may be ready in stages. Payment can follow in proportion, but only if the inspection covers each stage and the documentation matches the quantity paid for.

Trade Terms and Who Pays What

Payment terms and delivery terms are separate but interact, and confusing them causes cost surprises.

EXW

Ex works means the buyer collects from the factory and carries all onward cost and risk. It gives the lowest quoted price and the most work for the buyer.

FOB

Free on board means the supplier delivers to the named port and clears export. It is the most common term in wholesale bag purchasing because it divides responsibility at a clear point.

CIF

Cost, insurance and freight means the supplier arranges and pays freight to the destination port. Convenient, but the freight cost is embedded in the price and hard to verify.

DDP

Delivered duty paid means the supplier handles everything to the buyer’s door, including duty. Simple for the buyer and usually the most expensive, with limited visibility of the components.

Term Supplier pays Buyer pays Risk transfers
EXW Production only Everything after factory gate At factory
FOB Export clearance, delivery to port Freight, insurance, import On board vessel
CIF Freight and insurance to port Import duty, onward transport On board vessel
DAP Delivery to named place Import duty and clearance At destination
DDP Everything including duty Nothing until delivery At buyer’s door
FCA Delivery to carrier Main carriage onward On handover to carrier

Why quoted prices are not comparable

A CIF price and an FOB price for the same bags differ by the freight component. Comparing them directly is a common error that leads buyers to choose a worse total cost.

Where the payment trigger sits

Under FOB the balance is usually due when goods are ready for loading. Under CIF or DDP the trigger may shift, and the buyer should confirm exactly which event releases payment.

Letters of Credit and Escrow

For larger first orders, instruments exist that protect both sides.

Letters of credit

A letter of credit commits a bank to pay against compliant documents. It protects the buyer because payment requires evidence of shipment, and protects the supplier because payment is guaranteed by a bank rather than a buyer.

When an LC makes sense

Usually above a threshold where the cost of the instrument is small relative to order value. Below that threshold the fees and administrative effort outweigh the benefit.

Escrow and platform payment

Escrow holds funds with a third party until conditions are met. It suits smaller orders and buyers without banking relationships that support an LC.

The cost of instruments

Both instruments carry fees, and both add documentation requirements that can delay shipment if discrepancies appear. They are worth using deliberately rather than by default.

Instrument Protects buyer Protects supplier Best fit
Telegraphic transfer Weakly Strongly once received Small to medium orders
Letter of credit Strongly Strongly Large orders
Escrow Strongly Moderately Small orders, new relationships
Documentary collection Moderately Moderately Established relationships
Open account credit Strongly Weakly Repeat buyers only
Card or platform payment Moderately Moderately Small sample orders

Discrepancies in documents

An LC pays only against compliant documents. Small discrepancies, from a spelling difference to a date mismatch, can delay payment and shipment. Review the draft before issuance.

When Credit Terms Appear

Credit terms are a sign of relationship depth, and reading them correctly tells a buyer a lot about their own position.

Why a new buyer rarely gets credit

Credit is extended against a track record. A supplier offering net 30 to a buyer who has never placed an order is taking unusual risk, which usually means either a very competitive market or a pricing premium that funds the risk.

What earns credit

Repeat orders paid on time, growing volume, and a documented inspection history. Credit is earned over several cycles, not negotiated at the first meeting.

Credit disguised as a price increase

When credit appears early, compare the price against a cash-terms alternative. The finance cost is usually embedded.

Partial credit as a step

A supplier may offer credit on part of an order, for example the balance on the second half of a repeat order. That is a reasonable intermediate position.

Relationship stage Typical terms What changed
First enquiry Full prepayment or 50 / 50 No history
First order 30 / 70 Standard commercial terms
Second order 30 / 70, faster scheduling Payment record established
Third order 20 / 80 or partial credit Reliability demonstrated
Ongoing Net 30 on part of volume Volume and trust
Strategic Net 60, forecast-based Planning integration

Credit and quality leverage

Credit shifts risk toward the supplier, which can reduce the buyer’s leverage on quality. Buyers sometimes prefer to keep paying before shipment precisely because it preserves the inspection gate.

Don’t chase credit too early

Asking for credit on a first order can signal either sophistication or instability, depending on how it is framed. Asking what terms become available after two clean orders is a better question.

Currency and Bank Charges

Currency decisions affect the real cost of an order and are often overlooked in negotiation.

Currency of the quote

Quotes are usually in the supplier’s domestic currency or US dollars. The currency determines who carries exchange rate risk between order and payment.

Who absorbs movement

If payment is made in a different currency from the quote, the buyer absorbs the movement unless the contract states otherwise. On orders with long lead times, this can exceed the negotiated price difference.

Bank charges

International transfers carry sending and receiving charges. Agree who pays which, and confirm the amount that must arrive at the supplier’s account, not the amount sent.

Intermediary banks

Correspondent banks may deduct fees in transit. A payment that leaves in full can arrive short, leaving a small balance that delays shipment.

Currency issue Risk holder Practical fix
Quote in supplier currency Buyer if paying in another Fix rate at order or pay in quote currency
Long lead time Buyer Rate clause or shorter validity
Sending bank fee Depends on instruction State charges shared or sender pays
Intermediary deduction Buyer unless agreed Pay in full to account, add buffer
Receiving bank fee Supplier usually Confirm in writing
Conversion spread Buyer Compare bank rates before sending

The shortfall that delays shipment

A balance payment arriving a few percent short because of intermediary fees is a common cause of shipment delay. Confirm the expected arrival amount before sending.

Verifying bank details

Confirm account details through a second channel, not only through the email thread that requested payment. Payment diversion fraud is a real risk in manufacturing supply chains.

Payment for Changes and Reorders

Changes during production and repeat orders raise payment questions that a first-order schedule does not cover.

Change orders

Material or specification changes after the deposit may require additional payment or a revised schedule. Agree in advance how changes are costed and when they are billed.

Tooling and development costs

Pattern making, tooling and development are usually paid separately and up front. Clarify whether these costs are one-off or amortised into unit price.

Reorder payment

Reorders typically follow similar terms, sometimes with a lower deposit once a record exists. Confirm whether the reorder accepts the original price or is repriced against current material cost.

Price validity

Agree how long a quoted price holds. Material costs move, and a price quoted for a first order may not apply to a reorder six months later.

Payment event Typical treatment What to confirm
Sample Paid in full, often refundable on order Refund condition
Tooling or pattern Paid up front, one-off Ownership of tooling
Bulk deposit 30 percent Trigger and refund terms
Change order Billed on approval Cost basis and schedule impact
Balance Before or on shipment Exact trigger event
Reorder Same or improved terms Price validity period

Who owns the tooling

If the buyer pays for a pattern or mould, ownership should be stated. Without it, moving to another supplier may mean paying again.

Change costs and schedule

Every change has a cost and a schedule effect. Approving a change should include explicit acknowledgement of both, otherwise the delivery date quietly slips.

Hands counting banknotes beside a printed payment schedule on a desk

Documents to Withhold and Request

The documents attached to payment are part of the buyer’s protection.

Before the deposit

Request a proforma invoice with the specification, quantity, unit price, trade term, lead time and payment schedule. It is the reference document for everything that follows.

Before the balance

Request the inspection report, packing list and photographs of the finished goods. These confirm that the goods exist and match before money moves.

After shipment

The bill of lading, commercial invoice, packing list and certificate of origin support import clearance and are needed for duty and compliance.

Retention

Keep proforma invoices, payment confirmations, inspection reports and shipping documents together per order. They are the record if a dispute arises later.

Stage Document Purpose
Before deposit Proforma invoice Defines specification and terms
Before deposit Bank details on letterhead Payment security
Before balance Inspection report Evidence of conformity
Before balance Packing list Quantity and carton detail
Before balance Finished goods photos Visual confirmation
After shipment Bill of lading Title and transport evidence

The proforma invoice as contract

In practice the proforma invoice often functions as the commercial agreement. Its accuracy matters more than its formality.

Negotiating Without Damaging Trust

Payment negotiation is normal, but how it is done affects how the supplier treats the order.

Negotiate structure, not just percentage

Asking for inspection before the balance is usually easier for a supplier to accept than reducing the deposit below material cost.

Explain the reason

A request framed as risk management is received better than a demand. Suppliers respond to buyers who explain what they are protecting against.

Offer something in return

Faster payment on the balance, a larger reorder commitment or a simpler specification can justify better terms. Trade something.

Know the walk-away point

Decide in advance which terms are unacceptable. Full prepayment to a new supplier, or no inspection right, are reasonable walk-away points.

Request Likely reception Better framing
Lower the deposit to 10 percent Resistance, material risk Keep 30 percent, add inspection gate
Pay after arrival Refused for new buyers Balance on documents
No inspection Not a buyer request Always require inspection
Hold back retention Uncommon in this trade Rework remedy instead
Free tooling Priced in elsewhere Pay tooling, own it
Longer price validity Possible with volume Tie to forecast commitment

Terms negotiated as risk management produce cooperation. Terms negotiated as pressure produce compliance, and compliance is not the same as care.

The retention question

Some buyers ask to hold back a percentage until after arrival. This is uncommon in bag manufacturing and usually signals distrust; a defined rework remedy achieves the same protection more acceptably.

Terms That Should Raise Concern

Certain payment requests correlate with problems, and recognising them early is cheaper than resolving them later.

Payment to a personal account

A request to pay an individual rather than a company account is a serious warning. It removes corporate accountability and is difficult to reverse.

Changed bank details by email

Any change to bank details should be verified through an independent channel. This is the most common fraud pattern in manufacturing supply chains.

Pressure for speed

Urgency around payment, particularly a deadline tied to a discount or a production slot, is a manipulation pattern rather than a commercial one.

Reluctance to document

A supplier unwilling to issue a proforma invoice or confirm terms in writing is signalling how they will behave if something goes wrong.

Signal Concern level Action
Personal account requested High Refuse, request company account
Bank details changed by email High Verify by phone or video
Full prepayment, new supplier High Reduce order or decline
No written proforma Medium Insist before payment
Urgency and discount pressure Medium Slow down, verify
Refusal of inspection High Walk away

The discount for immediate payment

A discount offered for same-day payment is not automatically a warning, but combined with urgency and an unverified account it should stop the transaction until verified.

Keeping Records

Payment records are the evidence base if a relationship deteriorates.

What to keep

Proforma invoice, payment confirmations with bank references, inspection reports, correspondence approving changes, and shipping documents. Keep them per order, not per supplier.

Matching payments to orders

Reference the order or proforma number in the payment description. Unreferenced payments create reconciliation work and are harder to reclaim.

Written change approvals

Any change to quantity, specification, price or schedule should be confirmed in writing before it is executed. Verbal agreements are the most common source of payment disputes.

Retention period

Keep records for at least the period during which a claim could be brought in the relevant jurisdiction, and longer for compliance purposes.

Bag factory shipping area with packed cartons on a pallet awaiting balance payment

When Payment Goes Wrong

Disputes are easier to resolve when the process was documented from the start.

Goods fail inspection

Follow the agreed remedy: rework and reinspection, or rejection with deposit recovery. Refer to the written standard rather than to opinion.

Goods arrive different from the approved sample

Compare against the retained sample and the inspection report. If inspection passed and the goods differ, the question becomes what was inspected.

Shipment delayed after full payment

This is the scenario that full prepayment makes worst. Written lead time with a remedy, and staged payments, are the protections that prevent it.

Escalation path

Start with a written summary of facts and the requested remedy. Most disputes resolve at this stage if the record is clear. Escalate to formal claim only after that.

Problem First step Evidence needed
Inspection failure Request rework per remedy clause Inspection report, standard
Deviation from sample Compare retained samples Approved sample, photos
Late shipment Written notice, revised date Contract lead time
Short quantity Packing list reconciliation Packing list, count record
Wrong goods shipped Photographic evidence Order spec, arrival photos
Payment not acknowledged Bank trace request Transfer receipt, reference

The cost of a dispute without documents

Without written terms, a dispute becomes a negotiation over memory. The party with better records usually prevails regardless of who was right.

Planning Cash Flow Around Terms

Payment terms determine when cash leaves and when goods arrive, and the gap between them is a working capital cost.

The full timeline

Deposit at order, balance at readiness or shipment, freight paid before or at arrival, duty at clearance. Cash is committed weeks before any goods can be sold.

Total cash requirement

Calculate the peak cash requirement, not the order value. Peak is usually the point where the balance and freight are paid but goods are not yet selling.

Financing the gap

Options include supplier credit, bank facilities and simply ordering smaller. For a first order, ordering smaller is the cheapest form of financing.

Terms that worsen cash flow

Full prepayment, DDP pricing and long transit times all increase the cash gap. Each is defensible individually, but together they can strain a small business.

Timeline point Cash out Cash in
Order placed Deposit None
Materials purchased None (supplier) None
Production complete Balance None
Shipment Freight None
Arrival and clearance Duty, handling None
Goods sold None Revenue

The deposit as working capital

The deposit is not a fee; it is working capital funding the supplier’s material purchase. Understanding this makes the size of a reasonable deposit easier to judge.

Assessing a Supplier’s Terms

The terms a supplier proposes reveal their experience with buyers and their own financial position.

Terms as a signal

A supplier who insists on full prepayment from an unknown buyer may have been burned before, or may be funding operations from customer deposits. Both are worth understanding.

Consistency across buyers

Ask what terms they offer other new buyers. A supplier who quotes unusually generous terms to win the order may tighten them once production starts.

Flexibility on structure

A supplier willing to accept inspection before the balance is showing confidence in their process. A refusal is informative.

Financial stability signals

Long-established suppliers with steady order books rarely need deposits to fund materials. Persistent cash pressure is a risk to delivery continuity.

Observation Interpretation Response
Accepts inspection before balance Confident in process Proceed
Insists on full prepayment Risk or cash pressure Reduce order size
Offers credit immediately Price includes finance cost Compare cash price
Declines written terms Weak documentation Request proforma
Pressure on deposit timing Cash flow strain Verify capacity
Transparent cost breakdown Professional practice Good sign

Visiting or auditing before payment

A factory visit before the deposit is the strongest due diligence available. Where a visit is impractical, a video walkthrough at the production line is a reasonable substitute.

Writing Terms Into the Contract

Terms only protect a buyer if they can be pointed to later.

The minimum written content

Deposit amount and percentage, balance trigger event, currency, bank account, inspection right, remedy for failed inspection, lead time, and trade term. One page is enough.

Defining the balance trigger precisely

“Before shipment” is ambiguous. “Within five working days of a passed inspection report and before container loading” is not.

Remedy language

State what happens on failure: rework at supplier cost and reinspection, or rejection with deposit refund within a stated period. Without this, the buyer has a complaint but no mechanism.

Governing terms and language

Agree which language version prevails if the contract exists in two languages. Ambiguity in translation becomes ambiguity in dispute.

Clause Weak wording Workable wording
Balance trigger Before shipment After passed inspection, before loading
Inspection Buyer may inspect Third-party inspection to agreed AQL
Failed inspection Supplier will fix Rework at supplier cost, reinspect at supplier cost
Lead time About 30 days 30 working days from deposit receipt
Deposit refund Refundable Refunded within 10 days if order cancelled pre-production
Price validity Subject to change Valid 30 days from proforma date

A payment clause that cannot be quoted in a dispute is a payment clause that does not exist.

Keeping it proportionate

A first order does not need a lengthy contract. It needs the payment schedule, inspection right and remedy stated clearly. Length is not protection.

A Practical First-Order Checklist

The following sequence keeps a first order’s payment exposure under control.

Before any payment

Confirm the supplier’s legal entity, verify bank details through a second channel, obtain a proforma invoice with full specification, and agree the inspection standard in writing.

At deposit

Pay the agreed percentage to the company account with the proforma number as reference, and request written confirmation of receipt and production start date.

Before the balance

Arrange inspection against the agreed standard, review the report, reconcile quantities against the packing list, and only then release payment.

After shipment

Collect shipping documents, check the arrival condition, and record any discrepancy with photographs before the container is fully unpacked.

Step Action Protects against
1 Verify entity and bank details Fraud and diversion
2 Obtain proforma invoice Specification ambiguity
3 Agree inspection standard Subjective pass or fail
4 Pay deposit with reference Reconciliation problems
5 Confirm production start Silent delay
6 Inspect before balance Paying for defective goods

What to do when the supplier resists a step

Resistance to inspection or to written terms is itself information. A supplier who cannot accommodate standard protection on a first order is unlikely to manage a problem well later.

Reviewing terms after the first cycle

Once the first order completes cleanly, negotiate the next set of terms from evidence: on-time delivery, inspection result, and payment reliability. That is when improvements are cheapest to obtain.

FAQ

Is a 30 percent deposit standard for a first bag order?

Yes. Thirty percent deposit with seventy percent balance before shipment is the most common structure in PU leather bag manufacturing. It funds material purchase while limiting the buyer’s exposure before inspection.

Should I pay the balance before or after inspection?

After. Make the balance conditional on a passed inspection against an agreed standard. This is the single most effective protection available to a first-time buyer and is widely accepted.

Can I negotiate the deposit down for a first order?

You can, but very low deposits often reduce supplier commitment and can lead to cheaper material substitution. A better negotiation is to keep the deposit at thirty percent and secure a firm inspection gate before the balance.

What if the supplier demands full prepayment?

Full prepayment to an unproven supplier places all risk on you. Reduce the order to a size you could absorb as a loss, or request a deposit and balance structure. A refusal to consider any staging is a warning sign.

When does a letter of credit make sense?

Usually on larger orders where the instrument’s cost is small relative to order value. Below that threshold, the fees and documentation effort outweigh the protection gained.

Do I need to pay for inspection myself?

Yes, normally. The fee is small relative to order value and is the cheapest risk reduction available. On larger orders it is negligible.

What trade term should a first-time buyer choose?

FOB is the most common starting point because it divides cost and responsibility at a clear point and keeps freight visible. CIF and DDP are simpler but embed costs you cannot easily verify.

Who pays the bank charges?

This is negotiable and should be stated. Confirm the amount that must arrive in the supplier’s account rather than the amount you send, since intermediary banks may deduct fees in transit.

How do I protect against bank detail fraud?

Verify account details through a second channel, such as a phone or video call with a known contact, never only through the email thread requesting payment. Treat any mid-order change of bank details as high risk.

Is it normal to ask for a retention payment?

Retention is uncommon in bag manufacturing and often reads as distrust. A defined rework remedy achieves similar protection and is more readily accepted by suppliers.

What happens to my deposit if I cancel?

It depends on when you cancel. Before materials are purchased, a refund is reasonable. After cutting has begun, the supplier has incurred cost. State the cancellation terms in writing before paying.

How long should a quoted price stay valid?

Thirty days from the proforma date is a common and reasonable window. Material costs move, so confirm the validity period rather than assuming the price holds indefinitely.

Planning a first wholesale bag order?

Send your specification, target quantity and destination to info@gionar.com and we will share the payment structures, inspection arrangements and trade terms we work with, together with a proforma invoice covering specification, lead time and delivery.

See our custom bag manufacturing portfolio

Leave a Reply

Your email address will not be published. Required fields are marked *